• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

News and entertainment worth sharing – York and North Yorkshire

  • News
  • Radio
  • Vouchers
  • WIN
  • More
    • Tickets
    • Lifestyle
    • Advertise
    • About
    • Contact

Why is all of York city centre being dug up at once?

Thu 14 Feb, 2013 by Chris Titley

"Welcome To York" says the sign at the junction of Pavement and Parliament Street. Photograph: YorkMix

Filed Under: Opinion

"Welcome To York" says the sign at the junction of Pavement and Parliament Street. Photograph: YorkMix
“Welcome To York” says the sign at the junction of Pavement and Parliament Street. Photograph: YorkMix

Tourists flocking to York for half term will be able to see all the classic seasonal sights. Snowdrops flowering in Museum Gardens. The Minster dappled in spring sunshine. Goslings trotting behind their mums at Rowntree Park.

Not to mention red and white crash barriers, clouds of cement dust and every other paving slab being pneumatically pulverised by men in fluorescent tabards. It’s like we’ve just launched the Festival Of Roadworks.

Anyone walking round York city centre at the moment cannot have avoided them. Everywhere you look is being dug up. Parliament Street. High Ousegate. Stonegate. St Helen’s Square. Back Swinegate. Grape Lane.

If you add in the massive hole outside the Minster, it feels like the whole city is a building site.

The buskers are being drowned out by the drills. Dozens of shops are near-inaccessible because of the barriers. Pedestrians, instead sauntering about our footstreets without a care in the world, are forced to dodge and weave like Ronaldo in a minefield.

This can’t be good for our image. What is going on? Surely it can’t just be the annual rush to spend the last of the council’s budget before financial year end?

We need better planning than this. Otherwise, next time we log on to Trip Advisor, we’ll be greeted with messages that say: “Went to York for the holiday. It was closed for repairs.”

 

*UPDATE* Friday, February 15

A spokeswoman from City of York Council said that all the roadworks are to lay cable for York’s new CCTV network. Although the work has been going on this week – half term for many local authorities – it will be suspended next week, when it is half term in York and elsewhere.


Trending »


Primary Sidebar

Footer

Contact us

General
01904 375 029

Studio/competitions
01904 375 030

Email YorkMix »

York office
8A Tower St
York
YO1 9SA

Listen to us

You can listen to YorkMix Radio using your DAB+ radio, Alexa or Google smart speaker, or online using the links below.

Click here to listen to YorkMix Radio »

Download the app from Google Play store
Download the app from Apple App store
About us

YorkMix is a trading name of
York Sound Ltd

Registered in England
Company no: 12831940
VAT no: GB289462452

YorkMix Radio public file

  • About
  • Public file
  • Privacy policy
  • Corrections & complaints
  • Contact

Copyright © 2025 YorkMix